The PERI solution featuring transversely and longitudinally movable working and protection platforms using standardized, rentable system components speeds up the refurbishment work at the Wiesbaden Central Station.
Erosion at an advanced stage on Mount Benacantil and the associated risk of falling rocks meant that extensive stabilization measures were required. For this, PERI planned and supplied a scaffold solution complete with working platforms which ...
A crew consisting of approximately 50 men, worked around the clock setting up over 1,212,542 lbs (552,000 kg) of PERI UP scaffolding to keep up with the demand of over 15 sub trades at this site.
For the various assembly phases, a 16.50 metre high working and support level could be erected using the PERI UP modular scaffold system which means all task assignments can be carried out very cost-effectively.